Shandong Yingzhi Technology Development Co., Ltd. is based in China and currently lists five active products in its catalogue. The company’s catalogue is grouped under the categories Power Plant Spares, Power Plants and Heavy Machinery, reflecting a focus on large‑scale energy equipment. The listed items include a Turnkey power plant, Power plant boiler, Boiler and BTG package, BTG boiler and a Circulating Fluidized Bed (CFB) boiler. Each product falls within the machinery and equipment HS chapter 84, which covers boilers, turbines and related plant components. The supplier is classified as an imported tier with a harbor trust tier, indicating that it operates through third‑party logistics for cross‑border shipments.
The Turnkey power plant entry suggests a complete plant solution that integrates generation, steam and power conversion equipment. Boiler‑related entries such as Power plant boiler, Boiler and BTG package, BTG boiler and CFB boiler refer to specific steam‑generation units that are commonly rated in megawatts (MW) and designed to operate at pressures up to 30 MPa or higher. While the catalogue does not provide technical dimensions, buyers can expect typical boiler specifications such as steam temperature 540 °C, water‑wall tube thickness 25 mm and design compliance with ASME Section I or equivalent Chinese standards. The CFB boiler is a subtype that uses a fluidized bed for fuel flexibility and lower emissions, a configuration frequently exported from China to emerging power markets.
The product list covers complete plant solutions and individual boiler units. Turnkey power plants usually combine a gas turbine or steam turbine, generators, balance‑of‑plant equipment and control systems, often sized from 50 MW to 300 MW for utility‑scale projects. Standard boiler grades for power‑plant boilers are classified by pressure (low, medium, high) and fuel type (coal, gas, biomass), with typical efficiency targets of 85‑90 % and emissions limits that meet local environmental regulations. BTG (Bottoming Turbine‑Generator) packages are designed to recover waste heat from the boiler exhaust, commonly rated at 10‑30 % of the primary turbine output. Circulating Fluidized Bed boilers are valued for their ability to burn low‑grade fuels while maintaining sulfur dioxide emissions below 200 mg/Nm³, and they are often built to meet IEC 62264 and ISO 9001 quality frameworks.
The catalogue includes a Turnkey power plant, a standard Power plant boiler, a Boiler and BTG package, a BTG boiler and a Circulating Fluidized Bed (CFB) boiler, all classified under the machinery HS chapter 84.
Typical HS codes fall within chapter 84, such as 8401 for steam turbines, 8403 for water‑tube boilers and 8404 for other boiler types, but the exact sub‑heading depends on the specific configuration and capacity.
Buyers usually request ISO 9001 quality management, ISO 14001 environmental management, CE marking for EU markets, and compliance with ASME Section I or the Chinese GB/T boiler standards.
Smaller boiler modules are often crate‑packed or palletized in 40‑ft containers; larger units are shipped as oversize cargo on open‑top containers, flat‑rack trucks or sea‑deck freight, secured with steel strapping.
A Turnkey power plant generally requires 12 - 24 months from order to commissioning, while an individual boiler unit can be manufactured and shipped within 6 - 12 months, depending on capacity and customization.